After-sales Service: | 24h Online, Professional After-Sales Service Team |
---|---|
Warranty: | 6-12months |
Type: | Road Roller |
Object: | Cement Concrete Pavement |
Moving Type: | Fixed |
Mixing Method: | Intermittent Compulsory |
Customization: |
---|
Suppliers with verified business licenses
Cabin | Left hand drive/right hand drive | |
HW76 Cabin, with one bed and two seats, with AC | ||
Vehicle Main Dimensions | Overall dimensions (L x W x H)mm | 10210×2495×3450 |
Wheel base (mm) | 4600+1350 | |
Weight in KGS | Tare Weight | 16000 |
Payload | 16000 | |
Front axles loading capacity | 1x7000 | |
Rear axles loading capacity | 2x16000 | |
Max. driving speed(km/h) | 90 | |
Engine | Brand | SINOTRUK |
Model | WD615.69 | |
Type | 4-stroke direct injection,6-cylinder in-line , turbo-charging and inter-cooling | |
Horse Power | 336 HP | |
Emission Standard | EURO II | |
Gearbox | HW19710, 10-forward & 2 reverse gear | |
Steering | Power steering | |
Brake | Dual air compressed brake | |
Tire | 12R22.5 radial tyre with one spare | |
Sprinkler Device | Bitumen Tank size : 6cbm Rock tank size : 10cbm Bitumen pump: QGB 950 , 950L/Min Hydraulic system : GPC4-50-25 Hydraulic motor: 05-130-BD31 Bitumen nozzle : 30 Spraying width: 3.75m Spraying capacity: 0.25-4 kg/m2 Burner :G20 Generator : Honda 5.5KW |
|
Control System | German SIEMENZ, computer controlled |
Minimum order quantity? |
MOQ is 1 unit. |
Production period? |
(Truck & trailer) Within 30-55 days since the moment we got your down payment. (Spare Parts) Within 7 days since the moment we got your down payment. Besides in large quantities or imported |
Payment term? |
TT: 100% T/T should be paid before delivery (Truck & trailer) 30% T/T as deposit, the balance should be paid before delivery. or L/C. (Spare Parts) large quantities: 50% T/T as deposit, the balance should be paid before delivery, Or LC,Western union |
Shipping? |
(Truck & trailer) by container or RoRo/Bulk shipment. (South America, Middle East, Africa, Oceania etc.) by road or railway.(Russia, Mongolia, Kazakhstan, Uzbekistan , Vietnam, Laos etc.) (Spare Parts) Air transportation, such as DHL, TNT, UPS, or Fedex. Large value or Large quantity of goods, by sea or LCL |
After payment |
We will prepare the goods as soon as the financial notice money arrives.(It takes about two days for the money to arrive, excluding the weekend). We will take photos for you to confirm before the delivery, and then delivery to you |
Suppliers with verified business licenses