After-sales Service: | 24h Online, Professional After-Sales Service Team |
---|---|
Warranty: | 6-12months |
Certification: | CE |
Condition: | New |
Rated Load: | 3-6t |
Transmission: | Hydraulic |
Customization: |
---|
Suppliers with verified business licenses
SPECIFICATION
|
Unit
|
CM778A/H
|
Operating Weight
|
kg
|
8200
|
Bucket Capacity
|
m³
|
1.0
|
Breakout Force
|
kn
|
38
|
Loading Lifting Capacity
|
kg
|
2500
|
Transportation L×W×H
|
mm
|
5920×2250×3770
|
Min. Ground Clearance
|
mm
|
300
|
Digging Depth
|
mm
|
52
|
Backhoe Capacity
|
m³
|
0.3
|
Swing Angle of Excavator Grab
|
°
|
190
|
Max. Pulling Force
|
kn
|
39
|
ENGINE
|
||
Model
|
|
YC4A105Z-T20
|
Type
|
|
In line/direct injection/four-stroke/injection combustion chamber
|
Cylinder Number
|
|
4
|
Inside Diameter×Stroke
|
|
102×120
|
Rated Power
|
kw
|
75
|
Rated Speed
|
r/min
|
2200
|
Min. Fuel Consumption
|
g/km.h
|
≤242
|
Max. Torque
|
n.m
|
≥410
|
Displacement
|
l
|
4.4
|
STEERING
|
||
Model
|
|
BZZ5-250
|
Steering Angel
|
°
|
±36
|
Min. Turning Radius
|
mm
|
6581
|
System Pressure
|
mpa
|
12
|
HYDRAULIC
|
|
|
Excavator Grab Digging Power
|
kn
|
46.5
|
Dipper Digging Power
|
kn
|
31
|
Bucket Lifting Time
|
s
|
6.8
|
Bucket Lowering Time
|
s
|
3.1
|
Bucket Discharge Time
|
s
|
2.0
|
AXLES
|
||
Brand
|
|
Famous Chinese brand
|
Main Transmission Type
|
|
Double reduction
|
Final Reducer
|
|
Single stage final reducer
|
Rated load
|
t
|
8/18.5
|
TRANSMISSION
|
||
Type
|
|
Single stage,three elements
|
Model
|
|
YJ280
|
Max Efficiency
|
%
|
84.4
|
Inlet Pressure
|
mpa
|
0.5
|
Outlet Pressure
|
mpa
|
1.1-1.3
|
Cooling
|
|
Oil cooling pressure circulation
|
Gear Box Type
|
|
Fixed Shaft Power Transmission
|
Oil Pressure of Clutch
|
kpa
|
1373-1569
|
Gears
|
|
2 speeds forward/reverse
|
Max. Speed
|
km/h
|
28
|
TYRE
|
||
Model
|
|
14-17.5/19.5L-24
|
Pressure of Front Wheel
|
mpa
|
0.55
|
Pressure of Back Wheel
|
mpa
|
0.223
|
BRAKE
|
|
|
Service Brake
|
|
Air oil caliper brake
|
|
External Type
|
|
|
Self-regulation
|
|
|
Self-balance
|
|
Emergency Brake
|
|
Operation Power Implementing brake
|
|
Manual Operation Power Terminating Brake
|
Minimum order quantity? |
MOQ is 1 unit. |
Production period? |
(Truck & trailer) Within 30-55 days since the moment we got your down payment. (Spare Parts) Within 7 days since the moment we got your down payment. Besides in large quantities or imported |
Payment term? |
TT: 100% T/T should be paid before delivery (Truck & trailer) 30% T/T as deposit, the balance should be paid before delivery. or L/C. (Spare Parts) large quantities: 50% T/T as deposit, the balance should be paid before delivery, Or LC,Western union |
Shipping? |
(Truck & trailer) by container or RoRo/Bulk shipment. (South America, Middle East, Africa, Oceania etc.) by road or railway.(Russia, Mongolia, Kazakhstan, Uzbekistan , Vietnam, Laos etc.) (Spare Parts) Air transportation, such as DHL, TNT, UPS, or Fedex. Large value or Large quantity of goods, by sea or LCL |
After payment |
We will prepare the goods as soon as the financial notice money arrives.(It takes about two days for the money to arrive, excluding the weekend). We will take photos for you to confirm before the delivery, and then delivery to you |
Suppliers with verified business licenses