Customization: | Available |
---|---|
After-sales Service: | 24h Online, Professional After-Sales Service Team |
Warranty: | 12 Month or 100000km |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Operation Weight (Standard Configuration) (kg) | 1810 | Engine | |
Standard Bucket Capacity (m3) | 0.04 | Engine Model | YANMA 3TNV70 PFN |
Rated Power/Rotate Speed (KW/rpm) | 11.5/2400 | Engine Type | Three Cylinders,China's Stage lll |
Transport Dimensionsmm | 3575*1050*2347 | Rated Torque/Rotate Speed (N.m/rpm) | 48/1600 |
Bucket Digging Force (KN) | 15.2 | Cylinder Diameter*Stroke (mm) | / |
Bucket Rob Digging Force (KN) | / | Output Value (L) | / |
Maximum Traction (KN) | 13.5 | Fuel Consumption (g/KW.h) | / |
Device | Fuel Tank Capacity (L) | 19 | |
Maximum Working Speed (Km/h) | 3.7 | Hydraulic System | |
Climbing Performance | 30 | Main Pump Pressure (Mpa) | 21.6 |
Total Length of the Crawler(mm) | 1593 | Main Pump Flow(L/min) | 17.2x2 |
Minimum Radius of rotation (mm) | 1443 | Operating Scope | |
Width of the Crawler(mm) | 230 | Maximum Digging Height (mm) | 3540 |
Ground Pressure (Kpa) | / | Maximum Dumping Height (mm) | 2440 |
Turning Mechanism | / | Maximum Digging Depth (mm) | 2310 |
Turning Speed (rpm) | 9 | Maximum Digging Radius (mm) | 3905 |
Q 1: What payment terms would you accept?
Normally, we accept L/C, T/T, Western Union, etc. We also could accept US dollars, China Yuan and other currencies.
Q 2: Which trade terms can we work?
Normally, we work on EX-WORK, FOB, CFR, CIF, FCA, CIP, CPT, DDU, DDP terms.
Q 3: What about the minimum order quantity?
The MOQ is 1 set.
Q 4: What is the warranty of equipment?
12 months from the date of start-up or 18 months from the date of shipment, whichever comes firstly.
Q 5: What is the lead time?
Usually, in stock or 15 days for excavator, air compressor and concrete pump. 3-6 months for the shotcrete manipulator.
Q 6: Are you original manufacturer?
Yes. We are one of the leading manufacturers on construction machinery in China.