Customization: | Available |
---|---|
After-sales Service: | 24h Online, Professional After-Sales Service Team |
Warranty: | 6-12 Months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Shacman H3000 6×4 Dump Truck | ||
Cab | MAN H3000 Cab Single bed Air conditioner | |
Driving Type | 6*4 left hand drivng | |
Max Speed (km/h) | 77 | |
Overall dimension(mm) | 8275×2500×3450mm | |
GVW( kg) | 25000 | |
Mass in working order ( kg) | 11200 | |
Wheelbase(mm) | 3775+1400mm | |
F/R track base (mm) | 1745/1620 | |
F/R overhang (mm) | 1525/1600 | |
Approach/Departure Angel (°) | 16/66 | |
Max. gradeability (%) | 28 | |
Tire | 13R22.5,10+1pc | |
Clutch | φ430 diaphragm spring | |
Steering | Hydraulic steering with power assistance | |
Gear box | FAST 10JSD120,10 Forward&2 Reverse,Manual | |
Tank capacity(L) | 380 | |
Bridge | Front axle | 9.5T MAN 7500kg |
Engine | Rear axle | 16T STR 2×16000kg |
Model | WP10.380E22 ,EURO 2 | |
Fuel Type | Diesel fuel | |
Type | Water cooled, four stroke, with exhaust valve brake, direct injection, supercharged intercooled | |
Exhaust(ml) | 9726 | |
Max output power/rotate speed (hp /rpm ) | 380hp/2200 | |
Max torque/rotate speed(N.m/rpm) | 1460N.m/1200-1600 | |
Braking system | Service Brake | Compressed air brake |
Park Brake | Spring energy | |
Auxiliary brake | engine exhaust brake | |
Eletric system | 24v | |
Payload(kg) | 25000 | |
Dump box dimension (L*W*H)(mm) | 5600×2300×1500mm | |
Dump box material | Carbon steel | |
Dump box thickness (mm) side /bottom | 4/8 | |
Hydraulic cylinder | Front-placed T-Shape cylinder | |
Dump box color | According to customer's requirement |
Minimum order quantity? |
MOQ is 1 unit. |
Production period? |
(Truck & trailer) Within 30-55 days since the moment we got your down payment. (Spare Parts) Within 7 days since the moment we got your down payment. Besides in large quantities or imported |
Payment term? |
TT: 100% T/T should be paid before delivery (Truck & trailer) 30% T/T as deposit, the balance should be paid before delivery. or L/C. (Spare Parts) large quantities: 50% T/T as deposit, the balance should be paid before delivery, Or LC,Western union |
Shipping? |
(Truck & trailer) by container or RoRo/Bulk shipment. (South America, Middle East, Africa, Oceania etc.) by road or railway.(Russia, Mongolia, Kazakhstan, Uzbekistan , Vietnam, Laos etc.) (Spare Parts) Air transportation, such as DHL, TNT, UPS, or Fedex. Large value or Large quantity of goods, by sea or LCL |
After payment |
We will prepare the goods as soon as the financial notice money arrives.(It takes about two days for the money to arrive, excluding the weekend). We will take photos for you to confirm before the delivery, and then delivery to you |