Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Item | Specification | |
Over parameter | Overall working weight | 16900kg |
Rated bucket capacity(Rock bucket) | 3.0cbm | |
Rated load | 5000kg | |
Max.traction force | ≥160kN | |
Max.breakout force | ≥180kN | |
Max.gradeability | 30° | |
Max.dumping height | 3120mm | |
Dumping distance | 1130mm | |
Overall distance (L×W×H) | 8079×3024×3382 mm | |
Engine | model | WD10G220E23 |
Type | Inline, water cooling, dry cylinder, direct injection | |
Number of cylinder-bore/stroke | 6-Φ126×130mm | |
Max. torque | 890N.m | |
Rated power | 162kw | |
Rated speed | 2000r/min | |
Min.fuel-consume tatio | ≤215g/kW.h | |
Transmission system | Torque converter | Single-stage four-element double-turbo |
Torque ratio | 4.10 | |
Transmission type | Planetary power shift | |
Gear shift | 2 forward shift, 1 reverse shift | |
Max. speed | 40.5km/h | |
Front and rear axle | Main transmission type | Spiral gear, first stage decelerate |
Final decelerate type | First stage, planetary gear decelerate | |
Tyre | Type specification | 23.5-25 |
Front tyre pressure | 0.39± 0.01 MPa | |
Rear tyre pressure | 0.33 ±0.01MPa | |
Steering system | Type | Articulated load-sensing hydraulic steering system |
Steering angle | 38° each side | |
Min.turning radius | Outside of bucket 6746mm, outside of rear wheel 6036mm | |
Hydraulic system | System working pressure | 17.5MPa |
Boom lifting time | ≤6.4s | |
Total time | ≤11.3s | |
Brake system | Service brake | Air over hydraulic disc brake on 4 wheels |
Parking brake | Manual parking brake | |
Fuel capacity | Fuel | 300L |
Hydraulic oil | 210L |
Minimum order quantity? |
MOQ is 1 unit. |
Production period? |
(Truck & trailer) Within 30-55 days since the moment we got your down payment. (Spare Parts) Within 3-10 days since the moment we got your down payment. Besides in large quantities or imported |
Payment term? |
TT: 100% T/T should be paid before delivery (Truck & trailer) 30% T/T as deposit, the balance should be paid before delivery. or L/C. (Spare Parts) large quantities: 50% T/T as deposit, the balance should be paid before delivery, Or LC,Western union |
Shipping? |
(Truck & trailer) by container or RoRo/Bulk shipment. (South America, Middle East, Africa, Oceania etc.) by road or railway.(Russia, Mongolia, Kazakhstan, Uzbekistan , Vietnam, Laos etc.) (Spare Parts) Air transportation, such as DHL, TNT, UPS, or Fedex. Large value or Large quantity of goods, by sea or LCL |
After payment |
We will prepare the goods as soon as the financial notice money arrives.(It takes about two days for the money to arrive, excluding the weekend). We will take photos for you to confirm before the delivery, and then delivery to you |