Customization: | Available |
---|---|
After-sales Service: | 24h Online, Professional After-Sales Service Team |
Warranty: | 6-12months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The driving type: | 6X4 |
Wheelbase: | 3600+1350mm |
(long x width × high) : | 11.57 x 3.4 x 3.62 (with push skis) m |
Before hanging/rearsuspension: | 1.6/3.02 m |
Maximum total quality: | 24.93 tons |
Rated load: | 10 (with push skis) tons |
Engine type: | WD615.92 E |
Number of cylinders: | 6 |
Emissions: | 9.726L |
Maximum output power: | 196KW |
Horse power | 299hp |
Emissions standards: | Euro 2 |
The gearbox type: | |
Forward gear number: | 0 |
Chassis brand larger superkings cars: | sinotruk HOWO |
Chassis models: | ZZ3257N3847C1 |
The front/rear axle description: | |
The spring of number: | 12/12 |
After/before between: | 1820/1850mmAfter the 2047 between: 1820/1850 mm |
The tyres number: | 10 |
Tire specifications: | 11.00-20,12.00-20 |
No | ZLJ5250TCXZE3 |
The vehicle type: | Multi-function car snow removal |
Brand: | SINOTRUK |
Inspecting and effective volume: | Dry medium: 10, the liquid medium: 2 m3 |
The average speed of homework: | Push the snow homework average speed of 30, and the average speed of 20 km cloth homework/h |
And cloth width: | 3-12 meters |
And cloth density: | Wet salt: 5 ~ 240, sand: 40 ~ 320 g/m2 |
Other special parameters: | Optional push skis: model SPS300, wide X high: 400 X1000;9°;Cut the snow blade Angle: 9 °;200Push the snow shovel extension forward: 200 |
Minimum order quantity? |
MOQ is 1 unit. |
Production period? |
(Truck & trailer) Within 30-55 days since the moment we got your down payment. (Spare Parts) Within 7 days since the moment we got your down payment. Besides in large quantities or imported |
Payment term? |
TT: 100% T/T should be paid before delivery (Truck & trailer) 30% T/T as deposit, the balance should be paid before delivery. or L/C. (Spare Parts) large quantities: 50% T/T as deposit, the balance should be paid before delivery, Or LC,Western union |
Shipping? |
(Truck & trailer) by container or RoRo/Bulk shipment. (South America, Middle East, Africa, Oceania etc.) by road or railway.(Russia, Mongolia, Kazakhstan, Uzbekistan , Vietnam, Laos etc.) (Spare Parts) Air transportation, such as DHL, TNT, UPS, or Fedex. Large value or Large quantity of goods, by sea or LCL |
After payment |
We will prepare the goods as soon as the financial notice money arrives.(It takes about two days for the money to arrive, excluding the weekend). We will take photos for you to confirm before the delivery, and then delivery to you |