Customization: | Available |
---|---|
After-sales Service: | 24h Online, Professional After-Sales Service Team |
Warranty: | 6-12 Months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Overall Dimension | 8545mm*2496mm*3350mm (L*W*H) | |||
Payload | 25-30ton | Curb Weight | 12500kg | |
Front Overhang | 1500mm | Rear Overhang | 1870mm | |
Wheelbase | 3825mm +1350mm | |||
CHASSIS | ||||
Chassis Brand | SINOTRUK HOWO | |||
Driving Type | 6x4 | |||
Cab | HW76, left hand drive, air-conditioner, one bed | |||
Engine and Power | Brand: SINOTRUK, diesel engine, 371hp (247kw), 4-stroke direct injection, 6-cylinder in-line with water cooling, turbo-charging and inter-cooling, Euro II emission standard |
|||
Steering | ZF8198, hydraulic steering with power assistance | |||
Transmission | HW19710, 10 forward speeds and 2 reverse | |||
Clutch | Model: 430, diaphragm clutch | |||
Front Axle | HF9, load capacity 9 ton, drum brake | |||
Rear Axle | HC16 tandem axle, load capacity 13000kg x2, ratio 5.73 | |||
Tire | 12.00-20, 11units including 1 spare tire | |||
CARGO BODY | ||||
Inside Dimension | 5600mm*2300mm*1500mm(L*W*H) | |||
Hydraulic Cylinder | Ventral T-type lift system | |||
Steel sheet thickness | Floor 8mm, side wall 6mm | |||
Tailgate | One-piece tailgate with upper articulation, safety lock system |
Tips to build your truck body | ||
Transport medium | Floor(mm) | Side(mm) |
Soil or Stone | 8 | 4 |
Construction Waste | 10 | 6 |
Big Ore | 12 | 8 |
Coal | 6 | 4 |
clay | 8 | 4 |
Grain or Chemical fertilizer | 6 | 4 |
Minimum order quantity? |
MOQ is 1 unit. |
Production period? |
(Truck & trailer) Within 30-55 days since the moment we got your down payment. (Spare Parts) Within 7 days since the moment we got your down payment. Besides in large quantities or imported |
Payment term? |
TT: 100% T/T should be paid before delivery (Truck & trailer) 30% T/T as deposit, the balance should be paid before delivery. or L/C. (Spare Parts) large quantities: 50% T/T as deposit, the balance should be paid before delivery, Or LC,Western union |
Shipping? |
(Truck & trailer) by container or RoRo/Bulk shipment. (South America, Middle East, Africa, Oceania etc.) by road or railway.(Russia, Mongolia, Kazakhstan, Uzbekistan , Vietnam, Laos etc.) (Spare Parts) Air transportation, such as DHL, TNT, UPS, or Fedex. Large value or Large quantity of goods, by sea or LCL |
After payment |
We will prepare the goods as soon as the financial notice money arrives.(It takes about two days for the money to arrive, excluding the weekend). We will take photos for you to confirm before the delivery, and then delivery to you |