Customization: | Available |
---|---|
After-sales Service: | 24h Online, Professional After-Sales Service Team |
Warranty: | 6-12 Months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Rated load(kg) | 3000 |
standard bucket capacity(m³) | 1.7 |
operating weight(kg) | 9600 |
Max.breakout force(kN) | 110 |
Max.dump height(MM) | 3150 |
Max.dump reach(MM) | 1150 |
Discharging Angle(°) | 45 |
Max.grade ability(°) | 30 |
Automatic leveling ability | Yes |
Lifting time(s) | ≤5.6 |
Total cycle time(lifting, dumping, lowering)(s) | ≤10 |
steering angle(°) | 35 |
Min turning radius(MM) | 4800 |
Wheel base(MM) | 2580 |
Tread(MM) | 1870 |
Min.ground clearance(MM) | 417 |
Overall dimensions (l×w×h)mm(MM) | 7000×2430×3060 |
travel speed(km/h) | |
Forward gear I | 0~6.8 |
II | 0~12 |
III | 0~23 |
IV | 0~35 |
reverse gear I | 0~8.5 |
II | 0~27 |
Engine Model | 6BT5.9-C125 |
Type | In line, water cooled, four stroke, dir.inject |
Rated power(kW) | 92 |
Rated speed(rpm) | 2200 |
acrot orque(N·m) | 480 |
Brake system | |
Service brake | Gas-liquid caliper disc brake |
Parking brake | Control with brake manual gas |
Minimum order quantity? |
MOQ is 1 unit. |
Production period? |
(Truck & trailer) Within 30-55 days since the moment we got your down payment. (Spare Parts) Within 7 days since the moment we got your down payment. Besides in large quantities or imported |
Payment term? |
TT: 100% T/T should be paid before delivery (Truck & trailer) 30% T/T as deposit, the balance should be paid before delivery. or L/C. (Spare Parts) large quantities: 50% T/T as deposit, the balance should be paid before delivery, Or LC,Western union |
Shipping? |
(Truck & trailer) by container or RoRo/Bulk shipment. (South America, Middle East, Africa, Oceania etc.) by road or railway.(Russia, Mongolia, Kazakhstan, Uzbekistan , Vietnam, Laos etc.) (Spare Parts) Air transportation, such as DHL, TNT, UPS, or Fedex. Large value or Large quantity of goods, by sea or LCL |
After payment |
We will prepare the goods as soon as the financial notice money arrives.(It takes about two days for the money to arrive, excluding the weekend). We will take photos for you to confirm before the delivery, and then delivery to you |