Customization: | Available |
---|---|
After-sales Service: | 24h Online, Professional After-Sales Service Team |
Warranty: | 6-12 Months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Parameter | Unit | ||
Rated load | 5 | t | |
Bucket capacity | 3 | m 3 | |
Dumping height | 3090 | mm | |
Dumping distance | 1130 | mm | |
Max.drawing force | 170 | kN | |
Max. traction | 165 | kN | |
Dimension | 8185×3000×3465 | mm | |
Operating weight | 17200 | kg | |
Boom lifting time | ≤6.0 | ≤6.0 | |
Total time of three devices | 11 | s | |
Wheelbase | 3300 | s | |
Min. turning radius (bucket outer) | 6910 | mm | |
Rated power | 162 | kW | |
Travel speed | I Gear (Forward/Backward) | 0-11.5/16.5 | km/h |
II Gear (Forward) | 0-38 | km/h | |
Long boom parameter | |||
Item | Standard bucket | Coal bucket | |
Bucket capacity | 2.7m³ | 3.5 | |
Rated load | 4.5t | 4.0t | |
Dumping height | 3710mm | 3550mm | |
Dumping distance | 1180mm | 1300mm | |
Dimension | 8870×3000×3350 | 8870×3000×3465 | |
Attachment parameter | |||
Attachment parameter _ snow plow | |||
Pushing snow width | 3800 | mm | |
Horizontal rotary angle | ±38 | ° | |
Vibrating angle | ±6 | ° | |
Obstacle crossing height | 0~150 | mm | |
Rated power | 162 | KW | |
Attachment parameter-clamp | |||
Dumping height | 3241 | ||
Dumping distance | 1902 | ||
Min. circle diameter and max. opening | |||
Basic model | 800×1990 | ||
IV model | 430×2000 | ||
Attachment parameter-Sliding fork | |||
Fork folding angle | 20 | ° | |
Attachment length | 2053 | mm | |
Attachment width | 2516 | mm | |
Attachment height | 1200 | mm | |
Fork teeth length | 1200 | mm | |
Attachment parameter-Side dumping | |||
Bucket width | 3000 | mm | |
Dimension | 8310×3040×3465 | mm | |
Dumping height( straight/side ) dumping | 2960/4125 | mm | |
Dumping distance( straight/side ) dumping | 1272/105 | mm | |
Lifting height( straight/side ) dumping | 5407/6830 | mm |
Minimum order quantity? |
MOQ is 1 unit. |
Production period? |
(Truck & trailer) Within 30-55 days since the moment we got your down payment. (Spare Parts) Within 7 days since the moment we got your down payment. Besides in large quantities or imported |
Payment term? |
TT: 100% T/T should be paid before delivery (Truck & trailer) 30% T/T as deposit, the balance should be paid before delivery. or L/C. (Spare Parts) large quantities: 50% T/T as deposit, the balance should be paid before delivery, Or LC,Western union |
Shipping? |
(Truck & trailer) by container or RoRo/Bulk shipment. (South America, Middle East, Africa, Oceania etc.) by road or railway.(Russia, Mongolia, Kazakhstan, Uzbekistan , Vietnam, Laos etc.) (Spare Parts) Air transportation, such as DHL, TNT, UPS, or Fedex. Large value or Large quantity of goods, by sea or LCL |
After payment |
We will prepare the goods as soon as the financial notice money arrives.(It takes about two days for the money to arrive, excluding the weekend). We will take photos for you to confirm before the delivery, and then delivery to you |