Customization: | Available |
---|---|
After-sales Service: | 24 Hours Online Service |
Warranty: | Yes |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Category | Item | Measuring Unit | 21m | 25m | ||
Engine | output power | KW/(r/min) | 97/2600 | 132/2500 | 249/2000 | 132/2500 |
Pumping Systems | Max.Theor,output(high/low pressure) | m3/h | 37/63 | 50/80 | 60/100 | 50/80 |
Max.Theor.concrete output pressure(high/low pressure) | Mpa | 13/7.5 | 13/7.5 | 12/8 | 13/7.5 | |
Pumping frequency(high/low pressure) | min-1 | 14/24 | 19/30 | 14/23 | 19/30 | |
Concrete cylinder dia.×stroke | mm | φ200×1400 | φ200×1400 | φ200×1800 | φ200×1650 | |
Feeding height | mm | 1450 | 1450 | 1450 | 1450 | |
Placing Boom | Structure type | 3R | 3R | 4M | 4M | |
placing boom max height/depth/radius | m | 21/10.5/17 | 21/10.5/17 | 25/14.4/21 | 25/14.4/21 | |
Slewing angle | ° | 365 | 365 | 365 | 265 | |
Vehicle Paramaters | Overall dimensions | mm | 9570×2180×3495 | 9400×2480×3535 | 10283×2480×3670 | 9800×2480×3535 |
Total weight | Kg | 14680 | 15940 | 19000 | 15800 |
Minimum order quantity? |
MOQ is 1 unit. |
Production period? |
(Truck & trailer) Within 30-55 days since the moment we got your down payment. (Spare Parts) Within 7 days since the moment we got your down payment. Besides in large quantities or imported |
Payment term? |
TT: 100% T/T should be paid before delivery (Truck & trailer) 30% T/T as deposit, the balance should be paid before delivery. or L/C. (Spare Parts) large quantities: 50% T/T as deposit, the balance should be paid before delivery, Or LC,Western union |
Shipping? |
(Truck & trailer) by container or RoRo/Bulk shipment. (South America, Middle East, Africa, Oceania etc.) by road or railway.(Russia, Mongolia, Kazakhstan, Uzbekistan , Vietnam, Laos etc.) (Spare Parts) Air transportation, such as DHL, TNT, UPS, or Fedex. Large value or Large quantity of goods, by sea or LCL |
After payment |
We will prepare the goods as soon as the financial notice money arrives.(It takes about two days for the money to arrive, excluding the weekend). We will take photos for you to confirm before the delivery, and then delivery to you |