Customization: | Available |
---|---|
After-sales Service: | 24h Online, Professional After-Sales Service Team |
Warranty: | 6-12months |
Still deciding? Get samples of $ !
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
TECHNICAL SPECIFICATION | ||||||
Main specification | Chassis brand | Dongfeng Kingrun | ||||
Chassis model | DFL5160 | |||||
Overall dimension(L*W*H) | 7930×2500×3120 mm | |||||
Dust tank | 7.2 m3 | |||||
Water tank | 3.5 m3 | |||||
Gross weight | 15,800 kg | |||||
Chassis | Drive modle | 4X2 Right hand drive | ||||
Front axle | 6 ton loading capacity | |||||
Rear axle | 10 ton loading capacity | |||||
Wheel Base | 4500mm | |||||
Tyre size & number | 10.00R20, with one spare tyre | |||||
Max speed | 90 km/h | |||||
Engine | Model | B190 33 | ||||
Engine Type | Diesel,6 Cylinders ,Vertical in-line, water-cooled | |||||
Horse power | 140kw/190hp | |||||
Displacement | 5900cc | |||||
Emission | Euro III | |||||
Secondary engine | B140 /140HP | |||||
Water tank | volume | 3.5 m3 | ||||
material | 3MM stainless steel | |||||
warning system | Overflow or low level alarm device | |||||
Garbage tank | volume | 7.2 m3 | ||||
material | 4MM stainless steel | |||||
rear door of Garbage tank discharge Angle. | ≥85° | |||||
Hydraulic system | Main parts | Gear pump, hydraulic motor, hydraulic cylinder, electromagnetic valve | ||||
system pressure | 16 Mpa | |||||
oil temperature | 60 ˚C | |||||
Electric System | type | DC24 V | ||||
voltage | 12 V | |||||
storage battery | 24 V (12*2=24V) | |||||
sprinkler system | main parts | Electric diaphragm pump, water filter, front / rear nozzle, etc | ||||
Low pressure water system | model | Weilong 60/90 | ||||
flow | 60 m3/h | |||||
lift | 90m | |||||
Sweep the disk device | type | Four sweeping disks are set in the middle, driven by hydraulic motor, right front independent control and automatic avoidance function | ||||
Diameter of the disk | 850 mm | |||||
speed | high:110 middle:80 low:50 | |||||
angle | Lean forward: 4-6 degrees lean outward: 4-7 degrees | |||||
Sucking disk | type | Single suction, hydraulic control, spring suspension. | ||||
Dia of suction port | 200 mm | |||||
Suction and sweepering | sweeper Cleaning efficiency | ≥95% | ||||
Maximum suction size | 120 mm | |||||
sweeper cleaning width | 2.8-3.2 m | |||||
Maximum sweeper cleaning capacity | 60000 m2/h | |||||
Overhang dimension of disc brush | ≥400 mm | |||||
speed when sweepering | 3-20 km/h | |||||
Spart parts of the truck | Tire spare | 1 unit | ||||
Hand tools | 1 set | |||||
Operation & Maintenance manual | 1 unit | |||||
Hydraulic jack | 1 unit | |||||
air filter | 1 unit | |||||
fuel filter | 1 unit | |||||
diesel filter | 1 unit | |||||
oil filter | 1 unit |
SINOTRUK has an annual output of 180, 000 vehicles and 200, 000 engines capacity.
Minimum order quantity? |
MOQ is 1 unit. |
Production period? |
(Truck & trailer) Within 30-55 days since the moment we got your down payment. (Spare Parts) Within 7 days since the moment we got your down payment. Besides in large quantities or imported |
Payment term? |
TT: 100% T/T should be paid before delivery (Truck & trailer) 30% T/T as deposit, the balance should be paid before delivery. or L/C. (Spare Parts) large quantities: 50% T/T as deposit, the balance should be paid before delivery, Or LC,Western union |
Shipping? |
(Truck & trailer) by container or RoRo/Bulk shipment. (South America, Middle East, Africa, Oceania etc.) by road or railway.(Russia, Mongolia, Kazakhstan, Uzbekistan , Vietnam, Laos etc.) (Spare Parts) Air transportation, such as DHL, TNT, UPS, or Fedex. Large value or Large quantity of goods, by sea or LCL |
After payment |
We will prepare the goods as soon as the financial notice money arrives.(It takes about two days for the money to arrive, excluding the weekend). We will take photos for you to confirm before the delivery, and then delivery to you |