Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model | FR80E | FR150D | FR220D |
Technical parameters | |||
Operation Weight (Standard Configuration) (kg) | 7800 | 13850 | 22200 |
Standard Bucket Capacity (m3) | 0.32 | 0.6 | 0.92 |
Rated Power/Rotate Speed (KW/rpm) | 44.4/2100 | 72.7/2200 | 112/2100 |
Transport Dimensionsmm | 6100*2275 *2650 | 7700*2505*2850 | 9580*2980*3060 |
Bucket Digging Force (KN) | 56 | 93.2 | 139 |
Bucket Rob Digging Force (KN) | 38 | 69 | 108 |
Maximum Traction (KN) | 61 | 112 | 217 |
Device | |||
Maximum Working Speed (Km/h) | 4.3 | 5.4 | 4.9 |
Climbing Performance(°) | 35 | 35 | 35 |
Total Length of the Crawler(mm) | 2770 | 3730 | 4385 |
Minimum Radius of rotation (mm) | 1770 | 2270 | 2880 |
Width of the Crawler(mm) | 450 | 500 | 600 |
Ground Pressure (Kpa) | 35.8 | 38 | 44.9 |
Turning Mechanism | |||
Turning Speed (rpm) | 11.5 | 11.5 | 11 |
Engine | |||
Model | 4TNV98 | BB-4BG1TRP | AA6BG1TRP-04/ 6BTAA59-C150 |
Type | Four Strokes, Direct Injection,Water-cooling, Overhead Valve, Belt Pressurization | Four Cylinders, Direct Injection, Water-cooling, Overhead Valve, turbocharger |
Six Cylinders, Straight, Four Strokes, Direct Injection,Pressurization, Air Inter Cooling |
Rated Torque/Rotate Speed (N.m/rpm) | 244/1400 | 337.6/1600 | 614/1500 |
Cylinder Diameter*Stroke (mm) | 98*110 | 105*125 | 102*120 |
Output Value (L) | 3.059 | 4.3 | 5.88 |
Fuel Consumption (g/KW.h) | 257 | 240 | 221 |
Fuel Tank Capacity (L) | 246 | 385 | |
Hydraulic System | |||
Main Pump Pressure (Mpa) | 28 | 25.5 | 34.3/37.3 |
Main Pump Flow(L/min) | 162*2 | 234*2 | |
Operating Scope | |||
Maximum Digging Height (mm) | 7150 | 8500 | 10190 |
Maximum Dumping Height (mm) | 5030 | 6080 | 7260 |
Maximum Digging Depth (mm) | 4050 | 5435 | 6510 |
Maximum Digging Radius (mm) | 6335 | 8300 | 9875 |
Minimum order quantity? |
MOQ is 1 unit. |
Production period? |
(Truck & trailer) Within 30-55 days since the moment we got your down payment. (Spare Parts) Within 3-10 days since the moment we got your down payment. Besides in large quantities or imported |
Payment term? |
TT: 100% T/T should be paid before delivery (Truck & trailer) 30% T/T as deposit, the balance should be paid before delivery. or L/C. (Spare Parts) large quantities: 50% T/T as deposit, the balance should be paid before delivery, Or LC,Western union |
Shipping? |
(Truck & trailer) by container or RoRo/Bulk shipment. (South America, Middle East, Africa, Oceania etc.) by road or railway.(Russia, Mongolia, Kazakhstan, Uzbekistan , Vietnam, Laos etc.) (Spare Parts) Air transportation, such as DHL, TNT, UPS, or Fedex. Large value or Large quantity of goods, by sea or LCL |
After payment |
We will prepare the goods as soon as the financial notice money arrives.(It takes about two days for the money to arrive, excluding the weekend). We will take photos for you to confirm before the delivery, and then delivery to you |