Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | Yes |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Basic information | |
Model: | QY50D531 |
Machine size: length × width × height: | 13.300×2.750×3.650m |
Operating weight: | 41t |
Maximum travel speed: | 76km/h |
Minimum turning radius: | 12m |
Maximum climbing grade: | 30% |
Minimum ground clearance: | 280mm |
Lifting capacity | |
Rated lifting capacity: | 50t |
Rated lifting moment: | 1764KN.m |
Rated lifting moment with fully extended arm: | 940.8KN.m |
Maximum lifting height - basic arm: | 11.6m |
Auxiliary lifting arm installation angle: | 30° |
Operating parameters | |
Slewing speed: | 2r/min |
Outrigger span: longitudinal × transverse: | 5.92×6.90m |
Minimum order quantity? |
MOQ is 1 unit. |
Production period? |
(Truck & trailer) Within 30-55 days since the moment we got your down payment. (Spare Parts) Within 7 days since the moment we got your down payment. Besides in large quantities or imported |
Payment term? |
TT: 100% T/T should be paid before delivery (Truck & trailer) 30% T/T as deposit, the balance should be paid before delivery. or L/C. (Spare Parts) large quantities: 50% T/T as deposit, the balance should be paid before delivery, Or LC,Western union |
Shipping? |
(Truck & trailer) by container or RoRo/Bulk shipment. (South America, Middle East, Africa, Oceania etc.) by road or railway.(Russia, Mongolia, Kazakhstan, Uzbekistan , Vietnam, Laos etc.) (Spare Parts) Air transportation, such as DHL, TNT, UPS, or Fedex. Large value or Large quantity of goods, by sea or LCL |
After payment |
We will prepare the goods as soon as the financial notice money arrives.(It takes about two days for the money to arrive, excluding the weekend). We will take photos for you to confirm before the delivery, and then delivery to you |