Customization: | Available |
---|---|
After-sales Service: | Has |
Warranty: | Has |
Still deciding? Get samples of US$ 17500/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model | JC30 | JC40 | JC45 | JC60 | JC65 | JC100 |
Operating load (kg) | 300 | 500 | 700 | 850 | 1050 | 1100 |
Max Speed(km/h) | 9 | 10 | 12 | 12 | 12 | 12\18 |
Rated flux (L/min) | 37 | 60 | 62.5 | 75 | 75 | 75 |
High Flow Flux (L/min) | 120 | 140 | ||||
Tire(track) model | 23×8.5-15 | 8.5-15 | 10-16.5 | 12-16.5 | 12-16.5 | 12-16.5 |
Rated power (Kw) | 18.4 | 37 | 37 | 45 | 55 | 74 |
Fuel tank capacity (L) | 25 | 60 | 70 | 80 | 75 | 90 |
self weight bucket (kg) | 1500 | 2300 | 2700 | 2800 | 3500 | 3550 |
Bucket capacity (m³) | 0.2 | 0.3 | 0.4 | 0.4 | 0.5 | 0.55 |
Overall operating height (mm) | 3126 | 3300 | 3980 | 4000 | 4070 | 4070 |
Height to bucket hinge pin (mm) | 2399 | 2725 | 3080 | 3100 | 3150 | 3150 |
Hheight to top of cab (mm) | 1813 | 2000 | 2140 | 2160 | 2160 | 2160 |
Height to bottom of level bucket(mm) | 2399 | 2558 | 2913 | 2933 | 2983 | 2983 |
Without bucket length(mm) | 1918 | 2300 | 2640 | 2750 | 2880 | 2880 |
Overall length with bucket(mm) | 2560 | 2950 | 3420 | 3490 | 3580 | 3580 |
Dumping angle at maximum height(° ) | 36 | 40 | 40 | 40 | 40 | 40 |
Dumping height(mm) | 1882 | 2050 | 2380 | 2400 | 2450 | 2450 |
Dumping reach(mm) | 458 | 790 | 700 | 750 | 700 | 700 |
Rollback o bucket on ground(° ) | 24 | 30 | 30 | 30 | 30 | 30 |
Rollback of bucket at full height(° ) | 97 | 104 | 104 | 104 | 104 | 104 |
Wheelbase(mm) | 722 | 897 | 991 | 991 | 1115 | 1185 |
Ground clearance(mm) | 148 | 140 | 185 | 205 | 205 | 205 |
Angle of departure(° ) | 28 | 20 | 20 | 20 | 20 | 20 |
Front turning radius without bucket(mm) | 971 | 1098 | 1168 | 1198 | 1250 | 1278 |
Front tuning radius(mm) | 1557 | 1760 | 1958 | 1958 | 2112 | 2144 |
Rear tuning radius(mm) | 1146 | 1296 | 1630 | 1728 | 1774 | 1857 |
Rear axle to bumper (mm) | 738 | 964 | 1108 | 1208 | 1082 | 1082 |
Tread width (mm) | 747 | 1080 | 1450 | 1500 | 1500 | 1500 |
Width (mm) | 900 | 1350 | 1720 | 1880 | 1880 | 1880 |
Bucket width (mm) | 914 | 1400 | 1740 | 1880 | 1880 | 1880 |
Q1: Minimum order quantity? |
A: MOQ is 1 unit. |
Q2: Production period? |
A: Within 7 days since the moment we got your down payment Besides in large quantities or imported |
Q3: Payment term? |
A:TT: 100% T/T should be paid before delivery Besides in large quantities: 30% T/T as deposit, the balance should be paid before delivery, Or LC,Western union |
Q4: Shipping? |
A:air transportation, such as DHL, TNT, UPS, or Fedex. Large value or Large quantity of goods, by sea or LCL |