Customization: | Available |
---|---|
After-sales Service: | 24h Online, Professional After-Sales Service Team |
Warranty: | 6-12 Months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Cabin | Driving type 6x4 LHD HW76 Cab, with A/C and two seats, one bed, 70°hydraulically tillable to the front as attached photo for ref. |
|
Vehicle Main Dimensions | Overall dimensions (L x W x H)mm | 10550×2550×3500 |
Wheel base (mm) | 4600+1350 | |
Wheel track (front/rear) (mm) | 2022/1830 | |
Weight in KGS | Tare Weight | 12700 |
Payload | 25000 | |
Front axles loading capacity | 1x9000 | |
Rear axles loading capacity | 2x16000 | |
Max. driving speed(km/h) | 90 | |
Engine | Brand | SINOTRUK |
Model | WD615.69 | |
Type | 4-stroke direct injection , 6-cylinder in-line with water cooling, turbo-charging and inter-cooling | |
Horse Power(HP) | 336 HP | |
Emission standard | Euro | |
Gearbox | HW19710, 10-speed forward and 2-reverse | |
Clutch | Reinforced diaphragm clutch, diameter 430mm | |
Steering | ZF8098, power steering, hydraulic steering with power assistance | |
Oil tank | 400 L | |
Tire | 12R22.5 tubeless tire, 11pcs including one spare tire |
Refuse compactor structure parameters | |||
Equipment | |||
Structure | Body, sub frame, lifting rear part, the loading device, the pushing-out plate, hydraulic and electric systems | ||
Modes of the pressing | Manual, semi-automatic, automatic, lifting rear part operation manual, loading, pushing, pressing, pushing out automatic | ||
Body | |||
Version | All-metal | Shape | Arc-shaped |
Sidewalls/Bottom/Roof | Sheet carbon steel (thickness : 4mm) | ||
Front frame | Sheet carbonaceous steel (thickness : 5mm) | ||
Rear frame | Shaped profile from sheet carbon steel (thickness : 5mm) | ||
Basis | 120x120mm (thickness : 5mm) | ||
Loading bunker | |||
Working zone Lighting | 2 lamps | Mechanism of raising | Two hydraulic cylinders |
Loading bunker | All-metal with sidewalls and a loading ladle | ||
Sidewalls/Ladle floor material | Sheet carbon steel (thickness : 3/4mm) | ||
Ensuring tightness | Between the body and lifting back part in the lower part profile acid-proof rubber is used. | ||
Pressing system | |||
Pressure | 25 Mpa | Compaction ratio | 3.0 : 1 |
Loading cycle | 25-30 second | Unloading cycle | 15-20 second |
Features | Control mode diversification, bidirectional compression | ||
Pressing mechanism | The giving plate and hinge related pressing plate moving on two directing bars | ||
Pressing mode | Automatic pressing(1 full cycle and continuous pressing) and controlling of each cycle of pressing separately | ||
Control of pressing | Control from the external panel on the bunker | ||
Lifting rear part | |||
Mechanism of lifting | Two hydraulic cylinders | ||
Function description | Suitable for various rubbish bins | ||
Others | |||
Color and logo | Optional | ||
Standard configuration | Chassis, arc-shaped body, sub frame, rear lifting part, loading bunker, pushing-out plate, hydraulic system, pressing system, sewage tank, climbing ladder, pneumatic control. | ||
Selective configuration | PLC electric automatic control, multifunctional rear lifting part, rear handrail and footplate, other shapes of body, rear swing arm, and etc. |
Minimum order quantity? |
MOQ is 1 unit. |
Production period? |
(Truck & trailer) Within 30-55 days since the moment we got your down payment. (Spare Parts) Within 7 days since the moment we got your down payment. Besides in large quantities or imported |
Payment term? |
TT: 100% T/T should be paid before delivery (Truck & trailer) 30% T/T as deposit, the balance should be paid before delivery. or L/C. (Spare Parts) large quantities: 50% T/T as deposit, the balance should be paid before delivery, Or LC,Western union |
Shipping? |
(Truck & trailer) by container or RoRo/Bulk shipment. (South America, Middle East, Africa, Oceania etc.) by road or railway.(Russia, Mongolia, Kazakhstan, Uzbekistan , Vietnam, Laos etc.) (Spare Parts) Air transportation, such as DHL, TNT, UPS, or Fedex. Large value or Large quantity of goods, by sea or LCL |
After payment |
We will prepare the goods as soon as the financial notice money arrives.(It takes about two days for the money to arrive, excluding the weekend). We will take photos for you to confirm before the delivery, and then delivery to you |